Mach 1 Flight Training logo

Mach 1 Flight Training

LOVELAND, COKFNL
Part 61Onsite Maintenance

Quality Score

61

Fair

Training Costs
15/25
DPE Availability
0/19
Onsite Maintenance
19/19
Key Staff Credentials
3/11
Fleet Quality & Size
6/8
Website Transparency
3/3

Base (15) + components above = 61

About

FAA Part 61 Flight School offering PPL, CPL, Instrument, CFI-I, IPC and Flight reviews. Utilizing a modernized Cessna 172P for all our training.

Estimated PPL Training Cost

Showing estimated ranges only. to see exact pricing.
Line item Hours Rate (range) Subtotal (range)
Cessna 172P (Skyhawk II) (cheapest in fleet)70h
$90 – $355/hr
$6,200 – $24,900
Flight instruction (dual) 42h $35 – $135/hr$1,425 – $5,700
Ground instruction 20h $35 – $135/hr$675 – $2,725
Estimated Total Range $8,300 – $33,400

Instruction Rates

Showing estimated ranges only. to see exact pricing.
Flight Instruction$35 – $135/hr
Ground Instruction$35 – $135/hr

Aircraft (3)

Rental rates shown as estimated ranges. to see exact pricing and full details.

Cessna 172P (Skyhawk II)

Airplane · Single-Engine Land

Hourly$90 – $355/hr
Block
Fuel Surcharge
Avionics
Garmin GNS 430WWAAS GPSAspen EvolutionEFISGarmin GTX 330Transponder

Cessna 172P (Skyhawk II)

Airplane · Single-Engine Land

Hourly$90 – $355/hr
Block
Fuel Surcharge
Avionics
Garmin GNS 430WWAAS GPSAspen EvolutionEFISGarmin GTX 330ADS-B In/Out

Cessna 172P (Skyhawk II)

Airplane · Single-Engine Land

Hourly$90 – $355/hr
Block
Fuel Surcharge
Avionics
Garmin GNS 430WWAAS GPSAspen EvolutionEFISGarmin GTX 330Transponder

Listed Staff

Staff names are hidden. to reveal full staff details.
E•••••
M•••••

Frequently Asked Questions

Training for a Private Pilot Certificate at Mach 1 Flight Training is estimated to cost $8,300 – $33,400. to see the full breakdown with exact aircraft rental and instructor rates.

No, Mach 1 Flight Training operates under Part 61. Training is self-paced: you and your instructor set the curriculum rather than following a pre-approved syllabus. The FAA minimum for a Private Pilot Certificate under Part 61 is 40 flight hours, though most students need 60 to 70.

No, Mach 1 Flight Training does not have a Designated Pilot Examiner on staff. When you're ready for your checkride, you'll need to book with an independent DPE. Ask the school if they can point you to one nearby.

Mach 1 Flight Training trains in the Cessna 172P (Skyhawk II). Contact the school for current availability and hourly rental rates.

No flight simulators are listed for Mach 1 Flight Training. Some schools have basic Aviation Training Devices that may not be in our database. Ask them directly.

No, Mach 1 Flight Training does not charge a fuel surcharge. The published rental rates are your actual hourly cost.

Contact

Phone

Email

Website